Our Home Under Construction

click to go back to main page

To view a larger version of a picture, click on it -- to return, click the back button.

June 14, 2001

basement

The washer and dryer hookups changed the plans to finish part of the basement for my office. No big deal...I just have to find a diffent spot for it.

basement

Most of the duct-work was installed by the 14th and the basement was finally dry as they were able to hook power up to the sump.

basement

All of those boxes stacked up against the wall contain our shutters -- they arrived before the siding did.

basement

Another shot of the basement from a different angle.

morning room

They have installed most of the plumbing and finished the framing for the morning room's ceiling. Here, you can see the pipes that run for the upstairs bathrooms.

upstairs hallway

Standing in the door of the master bedroom, you can see that the upstairs hallway isn't the conventional straight hallway. It's almost twice as wide as our hallway now and has neat angles that veer off into the bedrooms.

front bedroom closet

Standing in the front bedroom and facing the back of the house, you can see the framing for a closet. Also, they have the roof on by this point and the floors have dried out and been swept; It's really starting to look like a house at this point.

front yard

Looking out the upstairs bedroom, you can see the garage, the front yard and my bike -- we live so close, I can ride my bike to the homesite.

return to top

copyright © bHjp - 2003