Our Home Under Construction

click to go back to main page

To view a larger version of a picture, click on it -- to return, click the back button.

July 24, 2001

front of the house

The driveway, sidewalk and front porch are complete and all of the exterior lighting has been installed. We are almost ready to move in!

back of the house

A view of the back side of the house.

back of the house

Not much has changed since they put the siding up.

side of the house

Here you can see the heat pump and the gas and eletric hookups.

foyer

The baseboards have been painted, the carpet is installed and all of the wall-plates are in place.

foyer

The hall light, doorbell and thermostat have been installed.

family room

Nice clean floors, nice white carpet, nice that we have a picture of it before the 4 kids and great dane mess it up.

morning room

The morning room.

kitchen

Notice the kitchen lights and the range hood are in place.

kitchen

A closer view of the kitchen cabinets.

dining room

The dining room with the chandelier installed.

downstairs bathroom

Yes, I put a picture of my toilet on the world wide web.

upstairs

Looking up the stairs...

upstairs

...and looking down the stairs.

master bedroom

The master bedroom.

master bath

A shot of the master bath with all of the fixtures and mirrors installed.

upstairs hallway

The hallway looks a lot different with the lights and carpet installed.

linen closet

The linen closet with the racks in place.

spare room

The spare room.

front bedroom

The front bedroom.

back bedroom

The back bedroom.

basement stairs

The basement stairs with the light on; they still need to be painted.

basement

Notice the wet spot from the 6 inches of rain we had the other day. The power was out for 16 hours and, well, so was the sump.

basement

The water heater has been installed.

basement

Notice the foam insulation sheets on the walls. The reflective surface really helps to light up the basement.